Grade II Listed External Restoration & Timber Redecoration: Battle, East Sussex

Overview

In August 2026, Asletts Ltd completed an extensive six-week external restoration and redecoration programme on a distinguished Grade II listed private residence in Battle, East Sussex. Delivered with careful conservation practices, the project encompassed external timber restoration, window and door redecoration, orangery joinery refurbishment, and specialist chimney masonry repairs designed to protect the historic building envelope against long-term coastal and rural weathering.

Project Details

Client: Private residential client
Project Duration: Six Weeks
Completion Date: August 2026

Location

Battle, East Sussex

Challenges and Objectives

Historic timber-framed and listed masonry properties require a balanced approach that combines traditional repair methods with breathable, high-durability protective coatings. Years of exposure had caused weathered timber surfaces, degraded external coatings, and deteriorating mortar joints across the exposed chimney stacks.

The project required meticulous preparation to ensure all historic architectural mouldings, sash windows, and bespoke timberwork were preserved without altering the heritage character or damaging the underlying original substrates.

Solutions and Execution

Asletts deployed skilled heritage decorators and masonry specialists to execute a coordinated multi-phase restoration:

  • Substrate Preparation & Timber Redecoration: Carefully stripping back compromised paintwork, sanding, and preparing all exterior timber windows, frames, entrance doors, and architectural trim before applying a high-grade, breathable exterior paint system formulated for listed structures.
  • Orangery Joinery Refurbishment: Dismantling and removing the property’s bespoke orangery doors for workshop-standard preparation, remedial timber treatment, and multi-coat finishing before re-hanging and precision-aligning the units for optimal weather-tight operation.
  • Chimney Stack Repointing & Structural Repairs: Raking out failed, decayed mortar across the high-level chimney stacks and repointing with conservation-appropriate mortar to restore structural masonry integrity and stop water ingress.
  • Chimney Flaunching & Weatherproofing: Re-flaunching the tops of the chimney stacks to secure the pots, completed with a dedicated Stormguard breathable water-repellent treatment to prevent freeze-thaw damage and driving rain penetration.

Outcome

Operating on a sensitive Grade II listed home demanded strict site discipline, daily dust and debris control, and careful staging to ensure minimal disruption to the homeowners. Every repair and decorative finish was completed in strict alignment with heritage conservation guidelines, preserving the home’s period aesthetic while reinforcing its weather resistance.

Conclusion

The six-week restoration revitalised the property’s façade, reinstating crisp architectural lines and providing lasting protection across all high-exposure timber and masonry elements.

The homeowners expressed absolute delight with the high standard of finish, highlighting the team’s craftsmanship, consideration, and meticulous attention to detail throughout the programme.