Environmental Vehicle Washdown Containment Fence: Biffa, Peacehaven

Overview

In June 2026, Asletts Ltd completed the fast-track fabrication and construction of a bespoke washdown containment fence at Biffa’s operational waste-management facility in Peacehaven, East Sussex.

Delivered within a compact one-week programme by Asletts’ directly employed site team, the project engineered a robust structural barrier to prevent effluent overspray from escaping the vehicle cleaning bay – safeguarding adjacent land and local watercourses while directing runoff into the facility’s dedicated drainage network.

Project Details

Client: Biffa
Project Duration: One week
Completion Date: June 2026

Location

Peacehaven, East Sussex

Challenges and Objectives

As part of mandatory fleet maintenance and hygiene protocols, Biffa routinely cleans and jet-washes heavy refuse collection vehicles (RCVs) within an outdoor wash bay. However, because the existing area lacked adequate vertical screening, pressurised overspray and runoff carried a risk of escaping beyond the designated wash footprint toward a nearby watercourse.

To meet stringent environmental compliance standards, the site required a physical containment solution that was:

  1. Resilient enough to withstand persistent high-pressure water impact, road grime, and harsh coastal weather.
  2. Engineered with rust-resistant, low-maintenance materials suited for continuous heavy industrial use.
  3. Constructed entirely without halting or disrupting active refuse fleet movements on a live, safety-critical waste management depot.

Solutions and Execution

Asletts carried out the full installation from initial setting-out to handover using direct in-house labour:

  • Site Assessment & Setting-Out: Surveying ground levels, drainage falls, and vehicle turning radiuses to determine optimal barrier placement without encroaching on daily traffic routes.
  • Structural Metal Framework Fabrication: Erecting a rigid, heavy-duty structural steel frame anchored to handle sustained wind loadings and potential site impact.
  • Rust-Resistant Industrial Cladding: Installing durable, corrosion-proof profiled cladding panels across the framework to form a seamless vertical barrier capable of deflecting high-velocity spray back into the wash apron.
  • Runoff Containment Detailing: Sealing and profiling perimeter interfaces to ensure all captured overspray drains directly toward the site’s regulated interceptor and drainage systems.
  • Live-Depot Safety Protocols: Implementing controlled exclusion zones and coordinating directly with site logistics managers, enabling plant movements to continue safely throughout the installation.

Outcome

This installation highlights Asletts’ agility in providing practical, cost-effective infrastructure solutions for commercial and environmental utility providers. By utilising directly employed operatives and maintaining tight programme control, we deliver high-impact industrial construction and containment projects safely within operational, high-traffic commercial environments.

Conclusion

Completed on time in just one week, the containment barrier provides Biffa with a reliable, durable asset that reinforces environmental compliance and site cleanliness.

The structure effectively halts uncontrolled overspray, eliminates environmental watercourse runoff risks, and enhances daily fleet washdown efficiency.

Customer Feedback:

“Asletts Ltd delivered the works efficiently and provided a practical, cost-effective solution for our site. We are very happy with the completed installation and the professional way the project was managed from start to finish.”

– Facilities Management, Biffa Peacehaven